
Demolition RAMS: What to Include for Asbestos and Stability
What a demolition RAMS needs: the written arrangements CDM 2015 requires, the asbestos survey, services, stability, exclusion zones and dust, with an example.
AI RAMS / Insights
How to write risk assessments, method statements and COSHH assessments for UK site work, with the HSE guidance behind each point.
All Articles
Page 1 of 2

What a demolition RAMS needs: the written arrangements CDM 2015 requires, the asbestos survey, services, stability, exclusion zones and dust, with an example.

What a working at height RAMS needs for ladders, mobile towers and MEWPs: the equipment choice, inspection, rescue and a worked example.

What a hot works RAMS needs: why heat is used, the permit, clearing combustibles, extinguishers, the fire watch and gas cylinders, with an example.

The three kinds of RAMS software, who each suits, what to check before you pay, and how to test a shortlist on your next real job.

Electrical RAMS: what to add for safe isolation, live work, site permits and certificates, with a worked example from an office fit-out.

Do you need a method statement for a small job? What the law asks of sole traders, when clients insist, and a 30-second check to run on your own job.

How to write a COSHH assessment in the UK: which substances need one, what the hazard symbols mean, a worked example and a copy-paste template.

How to write a method statement for UK construction work: the 10 sections to cover, a full worked example and a free copy-paste template.

How to create a method statement in AI RAMS, step by step: what the chat asks, the details only you can add and what to check before you download it.